The Bonner Springs School District has partnered with Energy Solutions Professionals to implement over $4.5 million of energy-saving facility improvement measures that are expected to save the district $170,000 annually in energy and operating costs.
At the top of the list of needs for the district was the installation of air-conditioning before the start of the 2018-2019 school year. Other energy-saving measures include LED lighting; water-saving plumbing fixtures; weatherization of doors, windows, and roof/wall joints; additions and enhancements to building controls; ventilation improvements; HVAC replacements; and energy conservation training. The installation was also complicated by the fact that the work was running in parallel with other new construction in district buildings.
%nbsp;